Skip to content
Condos, apartments & HOAs

Multi-Family & HOA EV Charging in San Mateo

Charging for condos, apartments and HOA communities from Foster City lagoon complexes to downtown San Mateo buildings near 3rd Ave.

EV chargers installed in a shared condominium parking garage

Shared Garages, Fair Charging

In a shared building, one resident's charger affects everyone's electrical capacity, parking rules and monthly bill. That is why condo and apartment charging stalls. San Mateo EV Charger Installation works with HOA boards, property managers and individual owners to get charging approved and installed. We start with a load study of the building's service, then propose a plan: individual metered chargers, a shared load-managed system, or a mix. We prepare the documents boards ask for and install with minimal disruption to residents. California law gives owners a path to request charging in common-interest communities; we help the board and owner reach a plan that works for both.

What a Multi-Family Project Includes

Multi-family work needs the electrical plan and the people plan. We bring both.

  • Building load study

    We measure the building's available capacity so the board knows how many chargers it can support now and later.

  • Board-ready documents

    Clear drawings, a scope of work and a load summary written for non-electricians who have to vote on it.

  • Individually metered chargers

    Each resident's charging is tracked to their own account, so nobody pays for a neighbor's car.

  • Load-shared systems

    Multiple chargers share a fixed amount of power, letting more residents charge without a costly service upgrade.

  • Network billing setup

    For shared chargers, we set up networked units that bill each driver for their own sessions.

  • Single-owner installs

    Owners with a deeded or assigned space can get a charger run from their own unit's meter where the layout allows.

  • Future-ready conduit

    We can install conduit and capacity for future spaces now, so adding chargers later is cheaper.

  • Permits and inspections

    We handle the permits and inspections for the common areas and individual units.

  • Resident-friendly scheduling

    We post notices, keep driveways clear and work in sections so residents can still park.

How We Work With Your Building

Load study and site visit

Call (650) 727-5460. We visit the garage and electrical room, measure capacity and learn how parking is assigned. Expect a written summary within days.

Proposal for the board

We present options with costs, from one owner's charger to a building-wide system. We can attend a board meeting to answer questions directly.

Installation and setup

Once approved, we pull permits, install in phases and set up metering or network billing. Residents get simple instructions for their first charge.

Why Boards and Managers Call Us

We speak board

We turn electrical detail into plain options and costs, so boards can decide without a dozen follow-up questions.

Fair cost allocation

Metering and network billing mean each driver pays for their own charging. That ends a lot of arguments before they start.

Room to grow

We design for the next ten chargers, not just the first one, so the building does not repeat the process every year.

Every job includes

  • Licensed C-10 & Insured
  • Written Proposals for Boards
  • Phased installs that keep parking open
  • EVITP-Certified Installers

Bring EV Charging to Your Building

Whether you are one owner or the whole board, start with a load study. We will give you options in writing.

(650) 727-5460

C-10 licensed · EVITP-certified · Permit and inspection handled